• List of projects over the last 10 years

    No.

    Project name

    Client name

    Year of implementation

    1

    Commercial development projects for hard coal and methane deposits on the Coal Department mines (Shakhtiskaya, Kazakhstanskaya, Saranskaya, Tentekskaya, Abayskaya, Lenin, Kostenko, Kuzembaev mines)

    Arselormittal Temirtau CD

    2013

    2

    Ekibastuz Hard Coal Field Commercial Development Project on the Bogatyr and Severniy coal pits in the Pavlodar Province, Kazakhstan.

    Bogatyr Komir

    2011-2012

    3

    Ekibastuz Hard Coal Field Commercial Development Project on the Vostochniy coal pit in the Pavlodar Province, Kazakhstan.

    Euroasian Energy Corporation

    2012-2013,

    2017

    4

    Ekibastuz Hard Coal Field Commercial Development Project on the Ekibastuzskiy coal pit (Area 11) in the Pavlodar Province, Kazakhstan.

    Angrensor Energo

    2012

    5

    Open-cut mining project for the Shoptykol field, Maikuben Basin, and the feasibility study under the project

    Maikuben-West

    2012

    6

    Kuu-Chekinsky Open Pit. Stripping and preparation at +245.0 m horizon. Mining and transportation unit design

    Borly Coal Department - Branch of the Kazakhmys Corporation LLP

    2012

    7

    Exploitation of the Karazhyra coal pit nearby the priority development site of the Karazhyra field and the feasibility study under the project

    Karazhyra Ltd. LLP

    2012

    8

    Commercial development project for the Shubarkol field. Stripping and preparation at +350.0 m horizon. Correction. Centralniy and Zapadniy open pits

    Shubarkol Komir

    2012-2013

    9

    Mining allotment project for the Priozernoye brown coal field development on the Priozerniy-2 open pit

    Sokolovka LLP

    2013

    10

    Priozernoye brown coal field commercial development project in the Kostanay Province, Kazakhstan.

    Tobol SEC JSC, Priozernye Ugli LLP

    2014

    11

    Building stone commercial development project on the Bogatyrskoe igneous rock field. Bogatyrskiy crushed rock quarry

    Bogatyr Komir

    2014

    12

    Mine fire protection. Correction. Detailed design for 8 mines of the Coal Department.

    Arselormittal Temirtau CD

    2014

    13

    Construction of the Abayskaya-Naklonnaya mine on the mine field No.10 of the Sherubai-Nurinsk coal area, Karagandy Province

    BAS Trading and Industrial Company LLP

    2011

    14

    Dolinskaya-Naklonnaya Mine construction project on the mine field No. 42, 42-bis in the Karagandy Basin

    Ukrkazugol LLP

    2007

    15

    Shubarkolskiy open pit. On-site explosive materials storage extension.

    Shubarkol Komir

    2005

    16

    Feasibility study for switching an existing boiler house from solid fuel to black mineral oil

    Konfety Karagandy JSC

    2005

    17

    Concrete mixing plant construction project

    Koksokhimmontaj-Proekt LLP

    2005

    18

    Construction management plan under the "Feasibility study of transition to the automated conveyor technology with coal blending in the Bogatyr coal pit"

    Bogatyr Komir

    2006

    19

    Detailed design. Shubarkol Camp. Hostel with 120 places

    Shubarkol Komir

    2006

    20

    Sarykolsky Coal Pit construction project.

    Gamma LLP

    2006

    21

    Ekibastuzskiy Coal Pit construction project, Area 11 of the Ekibastuz Basin.

    Angrensor

    2006

    22

    Crushed rock quarry on the Atygay building rock field. Project.

    Asia-Contract LLP

    2006

    23

    Detailed design of the Kyzyl-Tu field power supply, Yereymentau District, Akmola Province

    Energy DSB LLP

    2006

    24

    Stripping and preparation project for ±0 m horizon. Establishment of a weighing complex on the Vostochnaya Station.

    Euroasian Energy Corporation

    2007

    25

    Project for reclamation of mined soils discovered in course of an integrated survey of mining and land allocations of mines, coal pits, preparation plants not included in the liquidated mines register.

    Karagandalikvidshakht RSSE, SE Ministry of Energy of the Republic of Kazakhstan

    2007-2016

    26

    Project of a crushing and grading complex of the Keregetas Field stone quarry.

    Keregetas ore-mining company

    2007

    27

    Slime pit reconstruction and operation project for the OF-38 preparation plant process system

    Karugleresurs LLP

    2007

    28

    Atansor ore mine abandonment project

    Orken LLP

    2007

    29

    Detailed design for reconstruction of diesel locomotive servicing point of the Centralnaya Station engine house

    Shubarkol Komir

    2007

    30

    Project for mining allocations of Zapadniy and Vostochniy areas of the Zhayrem field

    Zhayremskiy GOK JSC

    2008

    31

    Quarry mining and transportation part project for reserves of the Novovolynskoe fluxing limestone field

    ImpulsLLP

    2008

    32

    Draft remedial action plan for the Tavolzhan and Kalkaman salt plants

    PavlodarsolLLP

    2008

    33

    Detailed equipment documentation for new cage shaft sinking and equipment of the Tentekskaya mine

    ArselorMittalTemirtau CD

    2008

    34

    Detailed design for heat supply reconstruction of downcast shaft of the Lenin mine.

    ArselorMittalTemirtau CD

    2008

    35

    Draft standards for air pollution emissions for the Tekturmas quarzite quarry

    Kramds Quarzite LLP

    2009

    36

    Construction of a fan installation on the Kazakhstanskaya mine single-cage shaft. Detailed design.

    ArselorMittalTemirtau CD

    2009

    37

    Quarry construction project for pilot sampling on the Benkalinskoye magnetite ore field. Ore stockpile on the open-pit side

    Vertex Holding LPP

    2009

    38

    Feasibility study of use of a dry preparation plant to improve coal quality during coal bed mining on the Lenin mine

    Arselormittal Temirtau CD

    2010

    39

    Reconstruction of an ammonium nitrate warehouse. Detailed design

    Euroasian Energy Corporation

    2010

    40

    Construction of motor roads for process needs of the Benkalinskoye field. Detailed design

    Vertex Holding

    2010

    41

    Feasibility study of reassessment of coal reserves of bed No. 4 on the Bogatyr and Severniy coal pits of the Ekibastuz basin for underground mining

    Centrgeolsyomka LLP

    2010

    42

    Saranskaya Mine. Process system for skip shaft rock hoisting to be transferred to coal drawing

    Arselormittal Temirtau

    2011

    43

    Detailed design for air shaft sinking, equipment and operation on the Ushkatyn-III ore mine. (Combined mining of the Ushkatyn-III ferromanganese field. Underground mine)

    Zhayremsky MCP JSC

    2011

    44

    Detailed design "Surface automated conveyor system facilities with coal blending on the Bogatyr coal pit (Areas 5, 6, 9, and 10)"

    Bogatyr Komir

    2012

    45

    Kazakhstanskaya mine. Construction project of the centre-related skip-cage rock shaft complex

    Arselormittal Temirtau

    2012

    46

    Construction of the Yarusnaya railway station at +130 m horizon on areas 9 and 10. Detailed design.

    Bogatyr Komir

    2015

    47

    Improvement of power supply reliability on mines of the Arselormittal Temirtau Coal Department

    Arselormittal Temirtau CD

    2015-2016

    48

    Construction of a continuous-flow automated conveyor coal mining system with coal blending on the Bogatyr coal pit (Areas 5, 6, 9, and 10). Detailed design.

    Bogatyr Komir

    2015-2016

    49

    Vostochny open pit. Stripping and preparation at -50 m horizon. Cyclic and continuous-flow stripping complex No.2. Project. Detailed design.

    Euroasian Energy Corporation

    2015

    50

    Feasibility study of mining and transportation equipment arrangement options for mining operations on the Vostochniy coal pit

    Eurasian Group LLP

    2015

    51

    Feasibility calculations (FC) for positioning of a FGX-12 - type dry pneumatic separation unit and raw coal sorting unit on the existing coal storage site.

    Angrensor Energo

    2016